Techemet Wet Laboratory
LOCATION
Pasadena, Texas
COMPLETED
2025
SQ FOOTAGE
2,200
CONSTRUCTION COST
2.5M


The Techemet Wet Laboratory Renovation project in Pasadena, Texas involved the renovation of existing facilities into a modern wet laboratory environment, supporting specialized testing, chemical processing, and sample preparation. The design integrates robust HVAC systems with humidity control, high-capacity exhaust and fume hood systems, upgraded electrical infrastructure, and specialized laboratory plumbing.
LOCATION
Pasadena, Texas
COMPLETED
2025
SQ FOOTAGE
2,200
CONSTRUCTION COST
2.5M
Techemet Wet LaboratoryProject Scope:
The renovation encompasses:
- Wet testing laboratories, sample preparation rooms, dry weight rooms, and supporting spaces.
- Laboratory-grade exhaust and ventilation systems, including multiple dedicated exhaust fans and silencer systems.
- Humidification systems for controlled lab environments.
- Specialized plumbing systems for lab operations, including acid-resistant drainage, lab water, and gas piping.
- Electrical distribution upgrades to serve high-demand laboratory equipment.
Design Challenges:
- Chemical Process Ventilation: Integration of multiple Greenheck exhaust fans and acid digestion fume hoods with precise airflow and control sequences.
- Humidity and Temperature Control: Installation of Condair EL Series humidifiers with precise load calculations for controlled environments.
- Equipment Coordination: Placement and routing of rooftop units (including owner pre-purchased RTU-2) and duct systems while maintaining code-required clearances and noise control via Vibro-Acoustics silencers.
- Plumbing Coordination: Routing acid waste, DI/RO water, and natural gas piping within tight ceiling and chase spaces.
Forensic and Problem-Solving Aspects:
- Used advanced 3D coordination to integrate ductwork, piping, and electrical systems within limited overhead space.
- Conducted detailed ventilation balancing strategies to meet laboratory air change requirements while minimizing energy use.
- Developed sequences of operation for integration with building automation and safety interlocks (including fire alarm tie-ins and sash position sensors for fume hoods).
Specific Mechanical Systems:
- Multiple dedicated exhaust fans (Greenheck SQ and USF series) sized from 570 CFM to 2,500 CFM.
- Silencers to meet NC levels in sensitive lab areas.
- Condair EL Series humidifier (30 lbs/hr capacity) with BACnet MSTP integration.
- Owner-provided Trane TSJ120A4S RTU with economizer, multi-stage cooling, and electric heat.
Specific Electrical Systems:
- Power distribution upgrades to support HVAC, lab equipment, and specialized exhaust/ventilation.
- Emergency power-off (EPO) integration for safety.
- Dedicated circuits for high-demand process equipment.
Specialized Plumbing Systems:
- Acid-resistant waste piping and venting.
- RO/DI water systems.
- Backflow prevention and pressure regulation.
MORE PROJECT CAPABILITIES
CONTACT
REACH OUT WITH A QUESTION OR QUOTE



