GK Engineers provided full MEP design with Goree Architects for Wyatt Field Service's 24,820 SF office on the 14th floor of an Energy Corridor tower, fitting a full-floor headquarters with its own server room into an existing tenant suite.
LOCATION
Houston, Texas
COMPLETED
2025
SIZE
24,820
CONSTRUCTION COST
$3.5M
GK Engineers provided full MEP design with Goree Architects for Wyatt Field Service’s 24,820 SF office on the 14th floor of an Energy Corridor tower, fitting a full-floor headquarters with its own server room into an existing tenant suite.
The design kept the floor’s existing 277/480V panels and transformer, with feeder and breaker ratings field-verified by the contractor, and added a dedicated transformer and panel for the server room. LED lighting with occupancy sensors, daylight zones and automatic receptacle control came in at 8.5 kW against a 15.9 kW energy code allowance.
The permit set was issued in February 2025. GK issued ceiling and IT room revisions through August 2025 as the tenant finalized its technology layout during construction.