TPC Lab and Office Buildback

LOCATION

Deer Park, Texas

COMPLETED

2024

SQ FOOTAGE

17,500

CONSTRUCTION COST

$8M

GK Engineers designed this 17,500 sq. ft. laboratory facility to meet advanced research and development requirements. Featuring state-of-the-art lab spaces equipped to accommodate cutting-edge scientific work while ensuring energy efficiency and safety. 

LOCATION

Deer Park, Texas

COMPLETED

2024

SQ FOOTAGE

17,500

CONSTRUCTION COST

$8M

The HVAC system is supported by two 270-ton air-cooled chillers designed to provide reliable cooling to the building. Heating is supplied by boilers, ensuring optimal indoor temperatures and comfort throughout the year. Advanced air distribution systems were incorporated to maintain precise temperature and humidity levels necessary for laboratory operations. The system supports high air exchange rates with controlled ventilation and air balance for safe lab environments.

A 480V, 2500-amp service supports the facility’s substantial electrical load requirements. The electrical distribution system was carefully designed to accommodate high-power laboratory equipment while ensuring reliability and redundancy. Energy-efficient LED lighting systems were installed to minimize power consumption and enhance the working environment. Life safety systems, including fire alarms and emergency lighting, were designed to meet local codes and standards.

The building’s plumbing system includes specialized services tailored for laboratory use, including compressed air, vacuum systems, and deionized water. The sanitary system incorporates acid waste lines connected to a neutralization tank to handle lab effluents safely. Emergency showers and eye washes are strategically placed throughout the facility for personnel safety.