Charolais

LOCATION
The Woodlands, Texas
COMPLETED
2026
SIZE
200 seats
CONSTRUCTION COST
$2.5M


GK Engineers provided full MEP design and construction administration for Charolais, a chef-driven steakhouse for Howard Hughes at Hughes Landing.
LOCATION
The Woodlands, Texas
COMPLETED
2026
SIZE
200 seats
CONSTRUCTION COST
$2.5M
GK Engineers provided full MEP design and construction administration for Charolais, a chef-driven steakhouse for Howard Hughes at Hughes Landing. An existing restaurant space became a 200-seat dining room, bar, wine room, two private dining rooms, an open kitchen and a dry-aging display cooler.
GK kept four of the five existing rooftop units and reused the existing hood fans and make-up air units, adding a dish hood, a wine room split system and tempering coils in the make-up air. The existing 400A, 480V service carries the new load, and gas piping was resized for the new cook line.
The project was issued for construction in September 2025 and opened in July 2026.
MORE PROJECT CAPABILITIES
CONTACT
REACH OUT WITH A QUESTION OR QUOTE



