Aldine ISD Davis High School Track and Field

Davis High School track and football field, Aldine ISD, Houston, TX - school athletics
LOCATION

Houston, Texas

COMPLETED

2023

SIZE

2 buildings

CONSTRUCTION COST

$4.4M

GK Engineers provided full MEP design for athletic improvements at Aldine ISD's Davis High School: a new concession stand with public restrooms, a press box, and the site electrical serving the track and football field.

LOCATION

Houston, Texas

COMPLETED

2023

SIZE

2 buildings

CONSTRUCTION COST

$4.4M

GK Engineers provided full MEP design for athletic improvements at Aldine ISD’s Davis High School: a new concession stand with public restrooms, a press box, and the site electrical serving the track and football field. GK also designed the IT and security infrastructure for the complex.

Both buildings use split DX and mini-split systems sized for food service and press box occupancy. Power extends from the existing 400A distribution through new 400A, 150A and 100A panels to the concession stand, press box, high-mast sports lighting and scoreboard, and the concession kitchen drains through grease waste to the campus sanitary system.

A load review of the existing distribution let the new buildings and field lighting tie in without a new utility service, with site conduit routed against the civil engineer’s utility plan. GK designed the project in 2019 and 2020 with Texas Sports and Civil Engineering as prime consultant.